Looking for a time frame for the replacement of my sidewalk( 13 Park ave) which is slated to be replaced full length. Please provide a follow up. Thank you.
Looking for a time frame for the replacement of my sidewalk( 13 Park ave) which is slated to be replaced full length. Please provide a follow up. Thank you.
8 评论s
Hamden, CT (官方验证)
已确认 Staff Engineer (官方验证)
previous request #4898669
We previously have shown work being completed under this previous SCF.
Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
Staff Engineer (官方验证)
Concerned (注册用户)
Concerned (注册用户)
关闭 Engineering Inspector (注册用户)
Concerned (注册用户)
Staff Engineer (官方验证)