Description
Looking for a time frame for the replacement of my sidewalk( 13 Park ave) which is slated to be replaced full length. Please provide a follow up. Thank you.
Looking for a time frame for the replacement of my sidewalk( 13 Park ave) which is slated to be replaced full length. Please provide a follow up. Thank you.
8 Commentaires
Hamden, CT (Membre officiel vérifié)
Reconnu Staff Engineer (Membre officiel vérifié)
previous request #4898669
We previously have shown work being completed under this previous SCF.
Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
Staff Engineer (Membre officiel vérifié)
Concerned (Utilisateur inscrit)
Concerned (Utilisateur inscrit)
Clos Engineering Inspector (Utilisateur inscrit)
Concerned (Utilisateur inscrit)
Staff Engineer (Membre officiel vérifié)