Road Conditions 已存档

121 Evans Street Watertown Massachusetts 在地图上显示 隐藏地图
Move the marker to represent your issue's location. The address will not change.

报告人

问题 ID:

2699038

Submitted To:

City of Watertown

类别:

Road Conditions

已查看:

539 次数

社区:

Watertown

已报告:


说明

The work that was started a few months ago on Evans Street has not been completed. The section of Evans Street between the intersection with Waltham Street and the intersection of Buick Street, to in front of 115 Evans, is still unpaved, and the sidewalk and curbs in front of several residences are still broken or were patched in a very ugly way. In front of three or more residences big slabs of concrete have just been left sitting on the edge of the street for months. The road has not been graded in front of driveways, making for potential damage to cars entering and exiting. No notification has been given to residents about next steps on this work. Please repair these conditions.


4 评论s

  • Watertown DPW (官方验证)

  • Andrew (注册用户)

  • Andrew (注册用户)

  • 关闭 Andrew (注册用户)

存档问题的评论被关闭。