Road Conditions La Kaydiiyey

121 Evans Street Watertown Massachusetts Ka Muuji Khariidadda Qari Khariidadda
Move the marker to represent your issue's location. The address will not change.

Wariyaha

Bixi Aqoonsiga:

2699038

Submitted To:

City of Watertown

Category:

Road Conditions

Arkay:

538 jeer

Xaafadda:

Watertown

La sheegay:

kusaabsan/saaran

Sharraxaadda

The work that was started a few months ago on Evans Street has not been completed. The section of Evans Street between the intersection with Waltham Street and the intersection of Buick Street, to in front of 115 Evans, is still unpaved, and the sidewalk and curbs in front of several residences are still broken or were patched in a very ugly way. In front of three or more residences big slabs of concrete have just been left sitting on the edge of the street for months. The road has not been graded in front of driveways, making for potential damage to cars entering and exiting. No notification has been given to residents about next steps on this work. Please repair these conditions.


4 Faalladas

  • Watertown DPW (La Caddeeyey Rasmi ah)

  • Andrew (Isticmaale Diiwaangashan)

  • Andrew (Isticmaale Diiwaangashan)

  • La xidhay Andrew (Isticmaale Diiwaangashan)

Faallooyinku waxay u xidhan yihiin arrimaha kaydsan.