This stretch of road in both directions between S. Lander St and Diagonal Ave on 6th Ave S has to take the cake. There are potholes and uneven road surface for the entire stretch.
It's now August 2nd, 2011 and no changes still. On top of that one lane has been shut down for work unrelated to road repair. My hope is a new repaving job and not just pothole patching. My tax dollar (I own three properties) being spent where?
2 评论s
Pory (客人)
Pory (客人)