Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the inspection.
Based on our inspection of the condition of the sidewalk, this site has been elevated to our claims list. Our contractors are currently on other job sites. We are scheduling the site as our on call contractors become available and we work through the claims list. Please be aware we schedule our claims list on a triage basis and handle the worst first.
The Town currently repairs sidewalks based on the roads with the oldest complaints. The Engineering Department re-inspected the site on 8/31/2021. We have determined that the sidewalk, walkout, and driveway apron do need to be repaired/replaced. Based on current funding, we do not have a good estimate on when the replacement will be conducted. The site has been added to our master list for repairs.
4 تعليقs
Staff Engineer (تم التحقق رسميا)
تم إقراره Staff Engineer (تم التحقق رسميا)
Engineering Inspector (مستخدم مسجل)
Engineering Inspector (تم التحقق رسميا)