الوصف
the sidewalks on the street in this area have not been repaired in this area going back as far as 1989, they seriously need to be put on the list to be done as soon as possible this is a hazardous situation someone is going to get hurt. As the homeowner in this area I have tried patching what I could and it falls apart.
26 تعليقs
Greg Cartier (مستخدم مسجل)
Greg Cartier (مستخدم مسجل)
Greg Cartier (مستخدم مسجل)
Greg Cartier (مستخدم مسجل)
Staff Engineer (تم التحقق رسميا)
Greg Cartier (مستخدم مسجل)
تم إقراره Staff Engineer (تم التحقق رسميا)
angelibruck@aol.com (مستخدم مسجل)
Staff Engineer (تم التحقق رسميا)
Our inspector will still do a follow up on the street inspection.
Thank you for your concern.
Greg Cartier (مستخدم مسجل)
Staff Engineer (تم التحقق رسميا)
Staff Engineer (تم التحقق رسميا)
The Town currently repairs sidewalks based on the roads with the oldest complaints. Once we get to a street, we attempt to repair all sidewalk problems on the street. We are currently working on streets with complaints from 2007 and are about to begin 2008 streets. Based on current funding and given your street is a 2014 street, we do not have a good estimate on when the repair will be conducted.
We are still sending out our inspect to re-verify likely next week.
We did inspect this site as well as 109, 115, and 119 recently. The other three were looked at on 6/7/2018 and #129 was inspected on 7/10/2018. We are well aware of the needs for repairs on the sidewalks along the entirety of Warner Street The majority of the street was assessed on 1/26/2017.
Greg Cartier (مستخدم مسجل)
Staff Engineer (تم التحقق رسميا)
Not knowing the address you are commenting on, I cannot address the reason. If it was prior to June 2016, it predates me.
In 2012, the protocol changed for the Town conducting the sidewalk repairs.
Prior to 2012, we only did sidewalks that were lifted by street trees (trees within the Town right of way). If the sidewalks were damaged or in need of repair, the adjacent owners were responsible.
Around 2012, there was a legal decision. I do not know where.
Starting in 2012, the Town repairs the right of way. If you called prior to 2012 and it was not tree related, it was not taken down and no action was taken by the Town.
I know most people do not like that answer, but that is history.
Greg Cartier (مستخدم مسجل)
Greg Cartier (مستخدم مسجل)
Staff Engineer (تم التحقق رسميا)
Please call the office and we will be very willing to discuss this or any other project with you. Our main number is 203-287-7040.
Mark Austin, Town Engineer
Staff Engineer (تم التحقق رسميا)
Staff Engineer (تم التحقق رسميا)
Staff Engineer (تم التحقق رسميا)
Staff Engineer (تم التحقق رسميا)
Greg Cartier (مستخدم مسجل)
Staff Engineer (تم التحقق رسميا)
مغلق Engineering Inspector (مستخدم مسجل)
angelibruck@aol.com (مستخدم مسجل)
Greg Cartier (مستخدم مسجل)