الوصف
Street recently dug up by Washington Gas as part of upgrade program. No parking signs have been up for the past two weeks for the street repair work, but nothing has been done in days and there are two exposed trenches that cut across the entire road.
2 تعليقs
تم إقراره DC 311 (مستخدم مسجل)
مغلق DC 311 (مستخدم مسجل)