Construction Đã lưu trữ

224 First Street Jersey City, New Jersey Hiển thị trên Bản đồ Ẩn Bản đồ
Move the marker to represent your issue's location. The address will not change.
OK

ID Vấn đề:

2968919

Submitted To:

City of Jersey City

Danh mục:

Parking issues

Đã xem:

265 lần

Vùng lân cận:

Downtown

Đã báo cáo:

vào

Mô tả

This site has been abusing the construction permitting situation in JC for almost three years. Rarely is there work being done that requires the blocking off of 4 parking spaces. The permits restricting parking are used for the personal vehicles of the work crew. This is not specific to this site, but First street is literally coming apart at the seams with traffic and parking strain. These four spots would go a long way to alleviating the circling, illegal parking and doubleparking that has become the dangerous norm. And when I say rarely used for construction, I mean specifically that in the last six months I believe the space in front of the site has been used for deliveries of materials or utility work three times.

The permitting process for construction in JC has got to be overhauled. Residents can't simply be made to suffer on an ongoing basis.

cũng đã hỏi...
Hỏi. What is the issue?
Đáp. Chưa có Câu trả lời nào

9 Bình luậns

  • RRC <small class="fwn">(Chính thức đã xác nhận)</small>

  • Helen Weinberg (Người dùng đã đăng ký)

  • Jim Geist (Người dùng đã đăng ký)

  • Jeremy J (Người dùng đã đăng ký)

  • Một người dùng SeeClickFix nặc danh (Người dùng đã đăng ký)

  • Jim Geist (Người dùng đã đăng ký)

  • Jim Geist (Người dùng đã đăng ký)

  • Được thừa nhận Construction Code Official (Chính thức đã xác nhận)

  • Đã đóng - Candace (Người dùng đã đăng ký)

Tính năng bình luận bị đóng lại đối với vấn đề đã lưu trữ.