Hal Seay

  • Center lines تم حفظه في الأرشيف
    Williams Street At Meridian Chelsea, MA - Chelsea
    Center lines were painted on the newly paved Willims St instead of lanes for right turn to East Boston and lane to go straight toward Chelsea St or turn left to Chelsea. It is causing traffic back ups due to people no knowing. Why are these things not planned ahead of time?
  • Street lights تم حفظه في الأرشيف
    50 Beacon St Chelsea Ma - Chelsea
    Street light still out or out again. May have something wrong with fixture?
  • Street lights تم حفظه في الأرشيف
    54 Beacon St Chelsea, Massachusetts - Chelsea
    Street light out [flashing]
  • Streetlight out تم حفظه في الأرشيف
    50 Beacon St Chelsea, Massachusetts - Chelsea
    Streetlight before 50 beacon street all for months
  • Sidewalk تم حفظه في الأرشيف
    23 Chestnut St Chelsea, Massachusetts - Chelsea
    Cement sidewalk needs to be poured weather permitting.
  • Sidewalk تم حفظه في الأرشيف
    23 Chestnut St Chelsea, Massachusetts - Chelsea
    Cement sidewalk needs to be poured weather permitting.
  • cracked sidewalk تم حفظه في الأرشيف
    21 Chestnut Street Chelsea, MA 02150, USA - Chelsea
    See picture
  • dangerous cracked sidewalk تم حفظه في الأرشيف
    21 Chestnut Street Chelsea, Massachusetts - Chelsea
    many people have been tripping on broken sidewalks. Makes it very hard to shovel in the winter.
    ** HOLLOW SIDEWALK **