Maintenance work processed on gas lines/meters in the summer of 2010 - workers equipment has destroyed the curbside. Erosion is occurring down into the roadway - storm water drains are being blocked. Requesting curbs be restructured.
Maintenance work processed on gas lines/meters in the summer of 2010 - workers equipment has destroyed the curbside. Erosion is occurring down into the roadway - storm water drains are being blocked. Requesting curbs be restructured.
21 تعليقs
Northsidewatch (مستخدم مسجل)
Northsidewatch (مستخدم مسجل)
Northsidewatch (مستخدم مسجل)
As of this date, March 24,2011 nothing has been done.
Viewed 109 times - but has never been acknowledged.
Turnaround time is to be approximately seven (7) days.
Northsidewatch (مستخدم مسجل)
Northsidewatch (مستخدم مسجل)
Hire new staff to process citizen concerns. Or better yet - contact Mayor Jones and let him review how effective this system and/or staff is handling private citizen concerns.
ONE HUNDRED TWENTY FOUR views and S-T-I-L-L NOT ACKNOWLEDGED.
REALLY!!!!!!!!?!!!!!!!!!!!!!!!!!!
مغلق cityofrichmond (مستخدم مسجل)
فتح Northsidewatch (مستخدم مسجل)
Northsidewatch (مستخدم مسجل)
Mary (مستخدم مسجل)
Northsidewatch (مستخدم مسجل)
Note: Status has not been changed from open to 'Acknowledged'. Can only assume that when status changes it is officially taken for action and the mayor might be privy to the issue.
Northsidewatch (مستخدم مسجل)
Note: Status has not been changed from open to 'Acknowledged'. Can only assume that when status changes it is officially taken for action and the mayor might be privy to the issue.
Northsidewatch (مستخدم مسجل)
تم إقراره RVA: Customer campaigner (مستخدم مسجل)
RVA: Customer campaigner (مستخدم مسجل)
Mary (ضيف)
Northsidewatch (مستخدم مسجل)
RVA: Customer campaigner (مستخدم مسجل)
RVA: Customer campaigner (مستخدم مسجل)
RVA: Customer campaigner (مستخدم مسجل)
6/21/2012 - #20020822416 - Richmond Tree Management noted they have placed the maintenance of the hole on a schedule. This repair should take place soon.
6/21/202 - #20020822417 - The curb & gutter replacement will take time to complete. However if updates need to be shared or follow through conducted this can be done by dialing Richmond Customer Care 646-7000 - rtt
Barton advenger (مستخدم مسجل)
مغلق RVA: Customer campaigner (مستخدم مسجل)
8/29/2012 Service Review: Stormwater Management noted the hump asphalt was offset to improve flow as of 8/19/2012 - Request #20020857165
We appreciate your communication that helps us to “Build A Better Richmond” together – rtt