Description
Following the new construction at Hovey/Belmont and the water main work, the entire length of Hovey St is uneven, filled with bumps and dips and dangerous to drive on.
Following the new construction at Hovey/Belmont and the water main work, the entire length of Hovey St is uneven, filled with bumps and dips and dangerous to drive on.
9 Commentaires
Watertown DPW (Membre officiel vérifié)
Public Works 1 (Utilisateur inscrit)
Public Works 1 (Utilisateur inscrit)
Mary.
Adam (Utilisateur inscrit)
Public Works 1 (Utilisateur inscrit)
Public Works 1 (Utilisateur inscrit)
Mary.
Adam (Utilisateur inscrit)
Adam (Utilisateur inscrit)
Clos Adam (Utilisateur inscrit)