Mô tả
Pseg had tore up the entire sherman ave block between north st and Congress st to replace gas lines for months. The entire block should be repaved. It's impossible to drive up the block with out hitting all the potholes and uneven pavement left behind by Pseg. They just patched up the holes the dug in front of every house and left the entire block a mess
cũng đã hỏi...
Hỏi. Street Name
Đáp. Sherman ave
Đáp. Sherman ave
Hỏi. Describe in detail the full request such as starting and ending point for resurfacing:
Đáp. the entire block of sherman ave. starting at Congress street going up to North st.
Đáp. the entire block of sherman ave. starting at Congress street going up to North st.
5 Bình luậns
RichDwyerPSEG (Người dùng đã đăng ký)
RichDwyerPSEG (Người dùng đã đăng ký)
RichDwyerPSEG (Người dùng đã đăng ký)
Building & Streets - Theresa (Người dùng đã đăng ký)
Đã đóng Building & Streets - Theresa (Người dùng đã đăng ký)