说明
Contractors never returned to replace concrete rubble and gravel with topsoil and sod on entire 5600 block of 39th street and intersections at both ends. This is in sharp contrast to recent work elsewhere in the neighborhood (e.g. 42nd street and Legation street).
3 评论s
已确认 DC 311 (注册用户)
Stuart (注册用户)
关闭 DC 311 (注册用户)