واعترف من قبل: St. Paul, MN (Saint Paul Connect)

Asphalt chipping - Rough Road patches not holding up تم إقراره

1075 3rd Street East Saint Paul, Minnesota عرض على الخريطة إخفاء الخريطة
تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

(ضيف)

ID قضية:

2347851

Submitted To:

City of St. Paul

فئة:

Pothole

شاهدوا:

585 مرات

ذكرت:

في

الوصف

From Earl to Johnson Parkway on 3rd St, the road is not up to the level it's supposed to be due to Fall road work. Workers used asphalt to temporarily buffer the manhole covers that were stickign up. That asphalt, on many 'mounds', is chipping away. Cars are swerving to opposite lanes because it's so bad on cars, even at a very slow speed. Please come to fix temporary asphalt mounds to blend or finish the street. Much appreciated!


تعليق جديد

تغييرات الحالة العامة غير متاحة لهذه المشكلة.