Good news - Work has finally started on the Bellevue potholes.
Bad news - The work is very poor. The two new patches in the block between Lamont and Newport that were just completed this week are too high and very rough. Not much better than what they replaced. Why can't these guys put down smooth asphalt?
19 评论s
Zane R (注册用户)
已确认 RVA: Customer campaigner (注册用户)
taz4021@cavtel.net (注册用户)
Odin's Dad (注册用户)
关闭 City of Richmond System (注册用户)
Reopened taz4021@cavtel.net (注册用户)
The patching was done, however it was done very poorly driving over it feels like you are driving over a series of speed bumps.
Very poorly done job, needs to be done and done correctly.
If the effort is made to do the job, then the effort should be made to do the job correctly.
Please do not close this ticket until the work has been done satisfactorily.
已确认 RVA: Customer campaigner (注册用户)
City of Richmond System (注册用户)
will repair next week. Equipment broke down on job site.
关闭 City of Richmond System (注册用户)
Reopened Odin's Dad (注册用户)
已确认 RVA: Customer campaigner (注册用户)
关闭 City of Richmond System (注册用户)
City of Richmond System (注册用户)
request has been completed.
Reopened Odin's Dad (注册用户)
The bad utility-related pothole in front of the shopping center in the 1200 block has not been addressed - its next to a manhole that is sitting up high, in the west-bound lane.
Thanks!
已确认 RVA: Customer campaigner (注册用户)
taz4021@cavtel.net (注册用户)
They need to be done correctly, this is a heavily trafficked street through Bellevue.
Please get these repaired and the one in front of CVS next to the manhole fixed it is about 8 inches deep.
关闭 City of Richmond System (注册用户)
City of Richmond System (注册用户)
completed cut out repair
City of Richmond System (注册用户)
completed pothole repair