Opis
Over the weekend, work crews milled off the outside portions of 8th street between Juniper and Piedmont. The removal of the outer asphalt apron has created a severe drop off from our driveway ramp on 8th st, to the street level. its about a 4" drop. this is causing cars and vehicles to bottom out and may result in under carriage damage. Please place some temporary blacktop filler in the gap until the street is repaved.
4 Skomentujs