The water/sewer line work has been occurring on Stevens road since July of 2013. It seems to be dragging out unceremoniously. All the while, our street looks like a war zone due to mud/dirt, gravel, potholes, old road cones, and equipment, haphazardly left in different yards down the block. The progress on the street appears stalled with only a dozen or so houses left on the street.
What is causing the delay in this project, and when can we expect it to wrap up and have our street back to normal (simple pavement and curbs) like other taxpayers enjoy across other areas of Raleigh?
9 Kommentierens
Emrys Treasure (Registrierter Benutzer)
Stevens Rd resident (Gast)
Anerkannt City of Raleigh 3 (Verifizierter Beamter)
Tricia B. (Registrierter Benutzer)
Ed Stempien (Gast)
Jessica (Registrierter Benutzer)
Fake Outrage (Registrierter Benutzer)
Ed Stempien (Gast)
You are correct, the original schedule had the contractor completing work in September. However the original project was for replacement of the waterlines only. You may recall we had to do an emergency repair with in the last year on part of the sewer in Stevens Rd. At that point we determined sewer was deteriorated beyond the useful life and had to be replaced. This work was added to the contract and extended the project length due to the additional work. We appreciate everyone’s cooperation and are working to complete the project as quickly as possible. For more information, please contact Ed Stempien, Project Manager, @ 919-996-3490 or at edward.stempien@raleighnc.gov
Geschlossen City of Raleigh 3 (Verifizierter Beamter)