Beschreibung
After repaving a section of Water St (great job!), the contractor left a large pile of asphalt on the side of the road. All heavy equipment has been taken away.
After repaving a section of Water St (great job!), the contractor left a large pile of asphalt on the side of the road. All heavy equipment has been taken away.
3 Kommentierens
Geschlossen Wes (Registrierter Benutzer)
angelibruck@aol.com (Registrierter Benutzer)
Department of Public Works (Verifizierter Beamter)