Beschreibung
Devlin construction has now been working here for two years (unacceptable). They removed the Stop sign at the exit from Grandora Crescent onto Grandin Road and put up a temporary one in a completely wrong location, they have taken down two yiel signs, they have taken down the pedestrian crossing sign and the Grandora Crescent location street sign. These are safety issues and completely unacceptable that they haven’t been put back. School kids cross here regularly.
4 Kommentierens
Public Works (Verifizierter Beamter)
Anerkannt Public Works (Verifizierter Beamter)
Public Works (Verifizierter Beamter)
Geschlossen Engineering Services (Verifizierter Beamter)