Beschreibung
An uneven concrete sidewalk in front of our building at 37-43 Holworthy Street was repaired a while back for safety reasons using asphalt. This is on a street where the rest of the sidewalk is concrete, and we were wondering whether the asphalt is a temporary repair and there is plan to replace it with new concrete at some point. Thank you very much.
3 Kommentierens
City of Cambridge (Verifizierter Beamter)
Public Works - TS (Streets & Sewers) (Verifizierter Beamter)
Anerkannt Public Works - TS (Streets & Sewers) (Verifizierter Beamter)