Beschreibung
Build up of weeds and trash in the area between the boardwalk and Dudley Ave ramp. This was previously reported last June still unresolved. Accumulation of weeds and water
water bottles cover the area. Plus seawall is cracked in multiple vertical and horizontal places.
auch gefragt...
F. What type of Public Works issue is this?
A. Beach issues
A. Beach issues
9 Kommentierens
ACUA (Verifizierter Beamter)
N (Registrierter Benutzer)
Geschlossen meg (Registrierter Benutzer)
Reopened Mcepp (Registrierter Benutzer)
Mr Oz (Registrierter Benutzer)
summer (Registrierter Benutzer)
Mr Oz (Registrierter Benutzer)
The residents of 5800 Boardwalk emptied and REMOVED the large planters off of the seawall as required by Public Works Department on 7/27/22. Now the backhoe can access the area to clean up the entire area between the seawall and the boardwalk.
Also, the seawall has an extreme crack that runs parallel and splits into other cracks.
Mr Oz (Registrierter Benutzer)
The area was worked on once; then left the area like a ditch! Which included blocking the drainage!!!!!
When will this be rectified and revisited?!?!?! The storm wall has a very large, horizontal crack that runs underneath the ramp across to the pool area of 5800 Condominiums. What is the plan for that repair? We know the Ventnor City Engineer was supposed to take a look to make a recommendation.
What is the decision?
And when will the work be done?